Chinese| English| Set home| Add to Favorites

FUS Thermal Insulation and Frost Resistance Material 首页 > Technical > FUS Thermal Insulation and Frost Resistance Material
| |
FUS System Technical Specification for Waterproofing and Drainage Structure of Railway Tunnel Waterproof board inspection - surface treatment - laying waterproof board –installing insulating layer - construction of waterproof layer. | ![]() |
■ Laying of waterproof board and insulating layer Waterproof board and insulating layer shall be between the concreting and secondary lining in line with the structure of “waterproof board + insulating layer + waterproof layer” along the entire section of the tunnel. The insulating composite structure, by “nailless laying” process, ensures no leakage. ■ Waterproof board construction Waterproof board joint lapping width and times of welding; ■ Insulating layer construction Piecing laying, close contact and reliable bonding with the substrate; ■ Waterproof layer construction Upon completion of insulating layer, waterproof coating or a layer of PVC film may be used as the waterproof layer for structural waterproofing. |
|
